Port of Vancouver overpass project earns top sustainability honour

The Holdom Overpass Project in Burnaby, B.C., has received recognition for its sustainable approach to infrastructure development, protecting local waterways, restoring native habitat, and reducing vehicle idling.
The Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISF) assessed the project’s performance across five categories: quality of life, leadership, resource allocation, the natural world, and climate and resilience.
The new overpass will extend Holdom Avenue south over the rail corridor and Still Creek to Douglas Road, replacing the existing Douglas Road rail crossing. The project aims to improve traffic flow and safety while increasing trade capacity by nearly 15 per cent at the Port of Vancouver’s North Shore terminals, a key hub for Canadian exports.
The design incorporates several sustainability measures, including improved pedestrian and cycling connections, enhanced mobility, protection of local waterways, and reduced vehicle idling. It also supports regional plans for sustainable transportation through new multi-use pathways.
Environmental work includes removing invasive species, planting native vegetation, and creating new wildlife habitat features, such as bat roosting structures. The project will also introduce public gathering spaces featuring First Nations art.
The design-build contractor, Aecon-Gateway Infrastructure Group Partnership, is also working with Light House through the Construction Plastics Initiative pilot. The initiative aims to increase the reuse and recycling of construction plastics.
Rail improvement
The overpass forms part of the Burnaby Rail Corridor Improvements Project, which includes road and rail upgrades to improve train movements between Burnaby and North Vancouver port terminals while reducing impacts on the surrounding community.
The latest recognition marks the port authority’s third Envision Platinum achievement. Its Low Level Road Project received the designation in 2015, while the Centerm Expansion Project and South Shore Access Project earned Platinum awards in 2024.

