 |
High-performance bent and flat glass helped Hariri Pontarini Architects create an undulating modern glass tower in Toronto, while still meeting the building team’s performance requirements.
|
» Read more
|
|
 |
Designed by Architecture49, the clubhouse for Golf Exécutif Montréal, located in Québec, is a green oasis. The building’s curve, echoing the driving range, harmonizes with the setting while meeting the needs of golfers.
|
» Read more
|
|
|
 |
The $37-million Trafalgar Park Community Centre project is one of the first in Canada to use the integrated project delivery (IPD) model. Under this arrangement, client, architect, and contractor operate as a team to apply lean construction principles to design, fabrication, and construction.
|
» Read more
|
|
|

|
Schluter-Systems’ DESIGNBASE-SL is a top set wall baseboard providing a modern and stylish alternative to traditional baseboards in commercial buildings and condominiums.
|
» read more
|
|
 |
Winning schools in Ontario and Alberta incorporate solar energy, greenhouses, beekeeping, and gardening in their sustainability efforts.
|
» Read more
|
|
|
 |
The challenge asks Ontario architects to show how architectural thinking can promote social equity, reduce isolation, or embody social justice.
|
» Read more
|
|
 |
When it comes to developing interior signage for a commercial building the most important choice is a well-designed system of modular informational signs.
|
» Read more
|
|
|
There is one thing you can count on with basements: given enough time, cracks will appear. The go-to repair is crack injection, but there is a high failure rate since the repair itself does not keep the wall from moving, which is often what causes these cracks. The only way to avoid this is by applying a permanent structural solution such as carbon fibre on top of the injection.
|
» read more
|
|
|
|
|