August 20, 2025
All aboard: Construction kicks off on new rail station
A major station build underway in Toronto with new platforms, bridges, and loops in progress. Get the full construction scoop.
CertainTeed Debuts Sustainable CarbonLow™ Wallboard Solutions
SPONSORED
CarbonLow is the first low-carbon gypsum panels in North America, cutting embodied carbon by up to 60 per cent. Ready to build greener?
Montreal towers put green space front and centre
Experience a fresh approach to urban living with twin towers designed to frame a green space in Montreal.
Experience the future of building in Asia
SPONSORED
Take the opportunity to experience the future of construction and register now.
How well do you know the evolution of waterproofing?
Take the quiz and see how well you know the history, risks, and modern applications of waterproofing.
How retrofits accelerate decarbonization
Cutting emissions by 90 per cent, explore how retrofits are reshaping sustainable building practices.
Virtual Events
Mitten Black Vinyl Siding
Mitten Building Products
Watch Now
Identification And Safety Solutions
Brady Corporation
Watch Now
NEWS
Message from the president: The power of shared knowledge
Get ahead: New CCDC Docs live training opportunities
MORE FROM CONSTRUCTION CANADA
•
NEWS
•
FEATURES
•
PRODUCTS
•
JOB BOARD
Brought to you by
and
Kenilworth Media Inc.
E-mail:
online@constructioncanada.net
Website:
www.constructioncanada.net
30 Leek Crescent, Suite 201
Richmond Hill, ON L4B 4N4
Tel:
(905)771-7333
, Toll Free:
(800)409-8688
Follow us on